Keith Maddison, DIO Programme Director, said: “The demolition of these 18 buildings is an important step in preparing the site, to allow the enabling works to be completed in preparation for construction to begin in the summer of this year, we are all working to a single goal of having the first aircraft arrival in late 2021.

Baltic Publications Limited

Contact Us

Editor: Michael Brash t: 0191 442 0198
e: MBrash@balticpublications.co.uk
Hypoint, Saltmeadows Road, Gateshead, Tyne & Wear. NE8 3AH

Get in touch

9 + 12 =

© 2024 Baltic Publications.