The site’s new, larger water tank holds 324,000 litres, almost half the capacity of an Olympic-sized pool.

More than 15,000m of pipes and cables, almost twice the height of Mount Everest, have been installed underground on site to accommodate current and future power, water and drainage needs. New energy-efficient boilers for the camp will also produce enough heat to meet all current and potential future requirements.